The Purchasing Process 10 Steps to TEK

 

  • At the earliest opportunity (e.g. from planning permission) fully dimensioned drawings should changes to ite details be sent to your local System Supplier.
  • Kingspan Off-Site will confirm receipt of the drawings and allocate the project a project number.
  • Kingspan Off-Site will issue a budget quotation normally within two weeks.
  • Kingspan Off-Site will discuss specific project details and any value engineering requirements with you. A revised quotation will be produced if necessary.
  • A written order will be given to Kingspan Off-Site.
  • Kingspan Off-Site will prepare and generate CAD working drawings.
  • CAD drawings are issued for approval and signing by you, usually within four working weeks.
  • A delivery date is allocated. This is normally upto six weeks from receipt of signed and approved drawings.
  • Typically the Kingspan TEK Building System is supplied and erected under contract. However, if you wish to erect the system yourselves you can use a contractor that is registered to erect the System. Kingspan Off-Site will provide a list of CITB trained Registered Contractors which is available for download from the website.
  • A Kingspan Off-Site representative will make periodic checks on your project to monitor the erection progress as required.